common

Clone Tools
  • last updated a few minutes ago
Constraints
Constraints: committers
 
Constraints: files
Constraints: dates
DEN-15267: Fixed alarm rank from prior change.

DEN-15267: Updated priority/rank for alarm 15 (dialysate temperature).

DEN-15267: Combined venous bubble alarm 128 and 129 into one alarm (128). Added Dialin command to enable/disable venous bubble alarm detection.

Bamboo Commit: Updated the Copyright section and replaced tabs with 4 spaces

Merge branch 'DEN-15023-variation-in-syringe-pump-position-between-dvt-units' into staging

Merge branch 'staging' into DEN-15023-variation-in-syringe-pump-position-between-dvt-units

Bamboo Commit: Updated the Copyright section and replaced tabs with 4 spaces

Merged DEN-15199

Merge branch 'staging' into DEN-15199-fw_dn_sprint_95

Bamboo Commit: Updated the Copyright section and replaced tabs with 4 spaces

Merged DEN-15214 to staging.

DEN-15199 updated the SW Rev number to 4

DEN-15214: Removed alarm 47 - UF rate alarm.

Merge branch 'staging' into DEN-15023-variation-in-syringe-pump-position-between-dvt-units

DEN-15199 addressed the code review comments

DEN-15199, DEN-15215 updated the titles alarms table

Merge branch 'staging' into DEN-15199-fw_dn_sprint_95

DEN-15199 added HD and DG dialin check in messages

Bamboo Commit: Updated the Copyright section and replaced tabs with 4 spaces

Merged DEN-15215

DEN-15215 updated the alarms title table

DEN-15199 updated the alarms properties table

Bamboo Commit: Updated the Copyright section and replaced tabs with 4 spaces

Merge branch 'staging' into DEN-15183-in-treatment-rinseback-workflow-changes

DEN-15199 renamed the test configuration message ID

DEN-15023: added rejection reason for maximum heparin

DEN-15199 added a message to receive release software configurations

Bamboo Commit: Updated the Copyright section and replaced tabs with 4 spaces

DEN-14325 merged staging and resolved the conflicts

DEN-15183: Added enum for treatment recirc user confirming patient disconnected.