Instructions

Clone Tools
  • last updated a few seconds ago
Constraints
Constraints: committers
 
Constraints: files
Constraints: dates
UI-LEAH-1924_Leahi/Features/Leah 1924 UI AM S4 Translation
UI-LEAH-1924_Leahi/Features/Leah 1924 UI AM S4 Translation
UI-DEN-17017_Release/Stagingmerge Release 17 [ ui.config ]
UI-DEN-17017_Release/Stagingmerge Release 17 [ ui.config ]
UI-DEN-16953_UI DN Release 15
UI-DEN-16953_UI DN Release 15
UI-DEN-15905-UI-BN-S102 [ Ready ]
UI-DEN-15905-UI-BN-S102 [ Ready ]
added image for recirc stop state.

    • binary
    ./58_end treatment connect venous to sampling port.png
    • binary
    ./65_recirc stop TEMP.png
Minor update to instructions

updated RO Permeate water sampling image

Merge remote-tracking branch 'origin/master'

DEN-15359: Usability: Arterial and Venous Pressure Alarm Limits

DEN-15407: UI: Add RO Permeate Sample to cleaning mode screen + messaging

DEN-15316: Usability: UI: Remove Extra Button for Disinfection

  1. … 2 more files in changeset.
updates to asset images

    • binary
    ./10_install acid line.png
    • binary
    ./11_install bicarb line.png
    • binary
    ./12_replace dialysate line cap.png
    • binary
    ./13_remove acid and bicarb connect.png
    • binary
    ./14_connect PAA.png
    • binary
    ./15_disconnect PAA.png
    • binary
    ./15_replace dialysate line cap_v4.png
    • binary
    ./16_connect dialysate lines to DG.png
    • binary
    ./16_remove acid and bicarb connect_v4.png
  1. … 92 more files in changeset.
updates for recirculation workflow

DEN-14988 : Add recirculation and patient connection instructions to normal rinseback workflow screens

updates to rinseback recirculation workflow

removed extra step for rinseback complete

Updates to UI asset images and workflow updates

    • binary
    ./20_connect dialysate lines to DG.png
    • binary
    ./22_disconect dialysate lines from DG.png
    • binary
    ./22_disconnect dialysate from cassette_v4.png
    • binary
    ./25_connect blood lines to dialyzer.png
    • binary
    ./25_filter connection 1A+1B-01.png
    • binary
    ./26_connect dialysate lines to dialyzer.png
    • binary
    ./26_fiilter connection 2A + 2B-01.png
    • binary
    ./27_PBA connection.png
    • binary
    ./27_PBo connection Arterial-01.png
    • binary
    ./28_PBo connection.png
    • binary
    ./29_PBo and PBA removal.png
  1. … 19 more files in changeset.
Re-committed the delete files/folders

    • binary
    ./15_replace dialysate line cap_v4.png
    • binary
    ./16_remove acid and bicarb connect_v4.png
    • binary
    ./19_replace concentrate cap-01.png
    • binary
    ./21_take sample with syringe_v4.png
    • binary
    ./22_disconnect dialysate from cassette_v4.png
    • binary
    ./23_pinch Arteriaal and Venous tubes-01.png
  1. … 49 more files in changeset.
Bamboo Commit: Updated the unhandled messages config file

    • binary
    ./15_replace dialysate line cap_v4.png
    • binary
    ./16_remove acid and bicarb connect_v4.png
    • binary
    ./19_replace concentrate cap-01.png
    • binary
    ./21_take sample with syringe_v4.png
    • binary
    ./22_disconnect dialysate from cassette_v4.png
    • binary
    ./23_pinch Arteriaal and Venous tubes-01.png
  1. … 48 more files in changeset.
Instructions.conf edited online with Bitbucket Regarding the request in the jira ticket DEN-14147. Line 43 has changed to decrease the decimal point from 2 to 1 to get closer on syringe marking which is by resolution of 0.2 . Suggested to create another ticket to follow up on the new request and discuss more related to the new request.

DEN-14736 IMP: Chem Flush

- Added chemical flush button in UI and its instruction screen

- Added the placeholder instructions

- Fixed the confirmation messages

  1. … 4 more files in changeset.