Modes

Clone Tools
  • last updated a few minutes ago
Constraints
Constraints: committers
 
Constraints: files
Constraints: dates
DEN-15367 removed the payload from the message that informs HD that DG is ready to dispense more fluid in DG. DEN-15571 fixed the chemical disinfect state machine to transition to cancel water path once the target temperature was not reached within the specified time

  1. … 1 more file in changeset.
DEN-15367 addressed the code review comments

  1. … 5 more files in changeset.
DEN-15522 fixed the heat disinfect active cool fill timeout not triggering. DEN-14805 fixed chemical disinfect reservoir leak alarm

Merge branch 'DEN-15367-hd_dg_test_configuration_setup' into develop

  1. … 4 more files in changeset.
DEN-15367 changed the RO permeate sample cancel water path. DEN-14004 changed the request message from UI to 0x89. DEN-15509 changed the reservoir threshold from 1700 to 1850 mL. DEN-15192 changed the concentrate pump low speed threshold.

  1. … 2 more files in changeset.
-DEN-15367 fixed the transition to cancel water path in RO permeate sample mode -DEN-14004 changed the request message ID to 0x89 from UI to send the DG service record -DEN-15192 changed the concentrate pumps low speed check threshold -DEN-15509 changed the reservoir full threshold from 1700 mL to 1850 mL.

  1. … 3 more files in changeset.
DEN-14004 added another message to receive and send DG service record upon request from HD. The format of the payload is different from the format that is sent to UI

  1. … 3 more files in changeset.
DEN-15367, DEN-15389, DEN-15511, DEN-15443 added code in the mode fill to check for the conductivity of the values in the produce state and have a timeout. Removed the acid check at the end of the mode fill

  1. … 1 more file in changeset.
DEN-15367, DEN-15404 worked on RO permeate sample mode

  1. … 2 more files in changeset.
DEN-15367, DEN-15404 work in progress. Updated the RO permeate sample mode code to be able to receive and send ready command to HD for further dispensing or canceling the run

  1. … 5 more files in changeset.
DEN-15367 added test configuration to be able to run chemical disinfect without PAA acid

DEN-15367, DEN-15446 renamed the function that checks whether any of the inlet water conditions are active in a cleaning mode

  1. … 2 more files in changeset.
Merged DEN-15367

  1. … 6 more files in changeset.
DEN-15446 added a function to check the status of the inlet water conditions and trigger the cleaning modes to transition to cancel water path

  1. … 2 more files in changeset.
DEN-15367 merged staging

  1. … 1 more file in changeset.
Bamboo Commit: Updated the Copyright section and replaced tabs with 4 spaces

Merged DEN-15478

  1. … 1 more file in changeset.
DEN-15478 updated the code to not check for the integrated volume vs. flow sensors if the fill is less than 550 mL

Bamboo Commit: Updated the Copyright section and replaced tabs with 4 spaces

  1. … 2 more files in changeset.
DEN-15455 updated the chemical disinfect caps monitor

DEN-15455 updated the chemical and chemical flush disinfect cap status check in start state

DEN-15367 added an RO permeate sample message

  1. … 3 more files in changeset.
DEN-15376 updated the chemical disinfect mode

DEN-15455 updated the code

DEN-15455 updated chem disinfect and chem flush disinfect to not clear the acid insert and remove alarms

  1. … 1 more file in changeset.
DEN-15342 addressed the heat disinfect active cool state skip

  1. … 1 more file in changeset.
DEN-15404 added doxygen comments to the RO permeate sample mode

  1. … 1 more file in changeset.
DEN-15455, DEN-15471 fixed the chemical disinfect caps monitor

DEN-15404 work in progress. Worked on the RO permeat sample mode

  1. … 4 more files in changeset.
DEN-15367, DEN-15404 updated the code