Controllers

Clone Tools
  • last updated a few minutes ago
Constraints
Constraints: committers
 
Constraints: files
Constraints: dates
DENBUG-318 changed the inlet water conductivity low alarm recovery

Merged DENBUG-318

  1. … 4 more files in changeset.
DENBUG-318 added a new event for min inlet water conductivity alarm from HD institutional record

  1. … 1 more file in changeset.
DENBUG-318 updated the code to receive all the DG institutional record items. Added code to use the min inlet water conductivity alarm from the institutional record

  1. … 5 more files in changeset.
Merge branch 'DENBUG-318-rejection-ratio-setting-feature-implementation-in-manufacturing-configuration-for-treatment-staging' into develop

DENBUG-322 added code to set CPi and CPo to 20 uS/cm if the values are less than 20 uS/cm

Resolved merge conflicts from DENBUG-318

  1. … 5 more files in changeset.
Bamboo Commit: Updated the Copyright section and replaced tabs with 4 spaces

  1. … 5 more files in changeset.
Merged release/p1b/staging

  1. … 5 more files in changeset.
DENBUG-298 updated the code from staging

  1. … 5 more files in changeset.
Bamboo Commit: Updated the Copyright section and replaced tabs with 4 spaces

  1. … 4 more files in changeset.
Merge branch 'DENBUG-307-concentrate-pump-tube-ruptures-during-heat-disinfection-staging' into develop

DEN-17263 addressed the code review comments

Merge branch 'DENBUG-307-concentrate-pump-tube-ruptures-during-heat-disinfection-staging' into develop

DENBUG-314 added more comment

Merge branch 'DENBUG-307-concentrate-pump-tube-ruptures-during-heat-disinfection-staging' into develop

DEN-17263 fixed the code to check the direction of the concentrate pumps and then decide based on that whether the measured speed values being negative or positive is correct or not

Merge branch 'DENBUG-307-concentrate-pump-tube-ruptures-during-heat-disinfection-staging' into develop

DEN-17263 added code to check the concentrate pumps speed direction

Merge branch 'DENBUG-307-concentrate-pump-tube-ruptures-during-heat-disinfection-staging' into develop

DENBUG-307 added code to broadcast the concentrate pumps speed the way they are regardless of the direction of the pump

Merge branch 'DENBUG-307-concentrate-pump-tube-ruptures-during-heat-disinfection-staging' into develop

DENBUG-307 made the concentrate pumps speed check all absolute to be able to check both positive and negative targets and measured speeds

DEN-17263 change the concentrate pumps speed check to not use fabs for the measured values. The target speed is checked in fabs to cover the negative target speeds

Merge branch 'DENBUG-307-concentrate-pump-tube-ruptures-during-heat-disinfection-staging' into develop

DENBUG-309 added mode flush to the 5% tolerance of the concentrate pumps speed check

Merged DENBUG-307

DENBUG-309 changed the concnetrate pumps speed monitor to 5% in heat disinfect

Merged DEN-17234

  1. … 8 more files in changeset.
Bamboo Commit: Updated the Copyright section and replaced tabs with 4 spaces

  1. … 86 more files in changeset.