Modes

Clone Tools
  • last updated a few seconds ago
Constraints
Constraints: committers
 
Constraints: files
Constraints: dates
DEN-8030 updated the documentation

DEN-8030 addressed code review comments

  1. … 3 more files in changeset.
DEN-8030 addressed code review comments

  1. … 5 more files in changeset.
DEN-8030 addressed code review comments and added concentrate pumps to heat disinfect

  1. … 7 more files in changeset.
DEN-8030 addressed code review comments

DEN-8030 addressed code review comments

  1. … 6 more files in changeset.
DEN-8030 merged staging

  1. … 14 more files in changeset.
DEN-8030 added a more code to the cooling stage of the RO filter in heat disinfect

  1. … 4 more files in changeset.
DEN-7605: Local merge w/ staging.

  1. … 10 more files in changeset.
DEN-7605: Re-ordered DG POST tests. Fixed comments.

  1. … 2 more files in changeset.
DEN-8030 updated the drain pump RPM conversion

  1. … 1 more file in changeset.
DEN-7605: Minor fixes.

  1. … 6 more files in changeset.
DEN-8030 added UI states to heat disinfect. Changed the heaters control.

  1. … 5 more files in changeset.
DEN-8030 tested modes and continued developing chemical disinfect

  1. … 6 more files in changeset.
DEN-7605: Addressed code review feedback.

  1. … 1 more file in changeset.
DEN-7605: Added POST messaging.

  1. … 2 more files in changeset.
DEN-7605: Added tare state to drain mode to allow time for reservoir to settle first.

  1. … 2 more files in changeset.
DEN-7605: Added delays to drain mode.

  1. … 2 more files in changeset.
DEN-7605: Pulled in V3 valve changes from chem disinfect branch.

  1. … 4 more files in changeset.
DEN-8030 fixed fluid leak detector

  1. … 2 more files in changeset.
DEN-8030 changed the drain modes drain pump RPM

DEN-8030 worked on chemical disinfect and V3 changes

  1. … 4 more files in changeset.
DEN-8030 made changes in the modes to be able to run on V3

  1. … 2 more files in changeset.
DEN-7605: Added FPGA compatibility check to FPGA POST. Added skeleton for f/w stack compatibility POST test.

  1. … 1 more file in changeset.
DEN-8030 continued working on chemical disinfect and added V3 DG valves configuration

  1. … 4 more files in changeset.
DEN-8030 worked on chemical disinfect mode

  1. … 8 more files in changeset.
DEN-7605: Added function to get previous op mode.

DEN-7568 added reservoir check to heat disinfect

DEN-7568 tested mode flush

  1. … 3 more files in changeset.
DEN-7568 addressed code review comments

  1. … 3 more files in changeset.