Clone Tools
  • last updated a few seconds ago
Constraints
Constraints: committers
 
Constraints: files
Constraints: dates
DEN-8030 updated the documentation

DEN-8030 adderessed a code review comment

DEN-8030 addressed code review comments

  1. … 3 more files in changeset.
DEN-8030 addressed code review comments

  1. … 3 more files in changeset.
DEN-8030 addressed code review comments and added concentrate pumps to heat disinfect

    • -131
    • +101
    ./Modes/ModeHeatDisinfect.c
  1. … 1 more file in changeset.
DEN-8030 addressed code review comments

DEN-8030 addressed code review comments

DEN-8030 merged staging

  1. … 7 more files in changeset.
DEN-8030 added a more code to the cooling stage of the RO filter in heat disinfect

DEN-7605: Local merge w/ staging.

    • -18
    • +44
    ./Controllers/TemperatureSensors.c
  1. … 1 more file in changeset.
DEN-7605: Re-ordered DG POST tests. Fixed comments.

DEN-8030 updated the drain pump RPM conversion

DEN-7605: Removed obsolete code.

DEN-7605: Minor fixes.

  1. … 1 more file in changeset.
DEN-8030 added UI states to heat disinfect. Changed the heaters control.

  1. … 1 more file in changeset.
DEN-8030: Updated heater PWM limits for V3.

DEN-8030 tested modes and continued developing chemical disinfect

    • -137
    • +342
    ./Modes/ModeChemicalDisinfect.c
DEN-7605: Addressed code review feedback.

DEN-7605: Added support for UI clock sync.

DEN-7605: Fixed merge conflicts.

DEN-7605: Added POST messaging.

DEN-7605: Added tare state to drain mode to allow time for reservoir to settle first.

DEN-7605: Addressed code review feedback.

DEN-7605: Added delays to drain mode.

DEN-7605: Added options to valves and pumps to delay changes in state.

DEN-7605: Initialize fluid leak override structure on power up.

DEN-8030 fixed load cells tare

DEN-8030 added more logic to check the load cells value during tare

DEN-7605: Pulled in V3 valve changes from chem disinfect branch.

DEN-8030 fixed fluid leak detector