ModeHeatDisinfectActiveCool.c

Clone Tools
  • last updated a few seconds ago
Constraints
Constraints: committers
 
Constraints: files
Constraints: dates
Bamboo Commit: Updated the Copyright section and replaced tabs with 4 spaces

  1. … 5 more files in changeset.
Merged release/p1b/staging

  1. … 5 more files in changeset.
DENBUG-298 updated the code from staging

  1. … 5 more files in changeset.
DG-DENBUG-298_User Unable TO Deliver Saline P1B Staging
DG-DENBUG-298_User Unable TO Deliver Saline P1B Staging
Bamboo Commit: Updated the Copyright section and replaced tabs with 4 spaces

  1. … 4 more files in changeset.
RESOLVED in CODE WALKTHROUGH.

RESOLVED in CODE WALKTHROUGH.

Not needed, but benign. RESOLVED in CODE WALKTHROUGH.

Not needed, but benign. RESOLVED in CODE WALKTHROUGH.

RESOLVED in CODE WALKTHROUGH.

RESOLVED in CODE WALKTHROUGH.

DENBUG-307 updated the active cool mode to set the actuators prior to transitioning to complete state

Done

Done

Done

Done

I used fabs so all are positive when monitoring is started.

I used fabs so all are positive when monitoring is started.

DENBUG-307 updated the active cool to run the concentrate pumps for a few seconds at the end of the mode

This check doesn't make sense to me. Measured speed will only be negative if set direction is reverse. So how could directions ever not match?

This check doesn't make sense to me. Measured speed will only be negative if set direction is reverse. So how could directions ever not match?

Aren't speeds (commanded and measured) always positive? Do we need the fabs?

Aren't speeds (commanded and measured) always positive? Do we need the fabs?

Measured speed (whether real or override) should always be positive. And if that's true, we shouldn't need this exception.

Measured speed (whether real or override) should always be positive. And if that's true, we shouldn't need this exception.

DENBUG-307 changed the heat disinfect active cool to run the concentrate pumps during the final reservoir drains

DG-DENBUG-307_Concentrate Pump Tube Ruptures During Heat Disinfection Staging
DG-DENBUG-307_Concentrate Pump Tube Ruptures During Heat Disinfection Staging
Bamboo Commit: Updated the Copyright section and replaced tabs with 4 spaces

  1. … 100 more files in changeset.
DEN-17220 added the code changes from staging

  1. … 2 more files in changeset.
DG-DEN-17220_Release 20 P1B Staging
DG-DEN-17220_Release 20 P1B Staging