Modes

Clone Tools
  • last updated a few minutes ago
Constraints
Constraints: committers
 
Constraints: files
Constraints: dates
Bamboo Commit: Updated the Copyright section and replaced tabs with 4 spaces

  1. … 3 more files in changeset.
Merged release/p1b/staging

  1. … 3 more files in changeset.
DENBUG-328 added code from staging

  1. … 3 more files in changeset.
HD-DENBUG-328_Venous Pressure Alarm Did Not Trigger When Pressure Dropped TO 0 Mmhg Stagi
HD-DENBUG-328_Venous Pressure Alarm Did Not Trigger When Pressure Dropped TO 0 Mmhg Stagi
RESOLVED IN CODEWALKTHROUGH

RESOLVED IN CODEWALKTHROUGH

Done

Done

Please add the comments mentioning the reason/purpose for the checking fluid level timeout alarm?

Please add the comments mentioning the reason/purpose for the checking fluid level timeout alarm?

HD-DENBUG-328_Venous Pressure Alarm Did Not Trigger When Pressure Dropped TO 0 Mmhg Staging
HD-DENBUG-328_Venous Pressure Alarm Did Not Trigger When Pressure Dropped TO 0 Mmhg Staging
Bamboo Commit: Updated the Copyright section and replaced tabs with 4 spaces

  1. … 4 more files in changeset.
Merged release/p1b/staging

  1. … 4 more files in changeset.
DEN-17299, DENBUG-318 added code from staging

  1. … 4 more files in changeset.
HD-DEN-17299_Release 22 P1B Staging
HD-DEN-17299_Release 22 P1B Staging
RESOLVED in CODE WALKTHROUGH

RESOLVED in CODE WALKTHROUGH

Done

Done

This is not really a rej ratio - it's a maximum reg ratio. We should make that clear in naming #defines, field names, etc...

This is not really a rej ratio - it's a maximum reg ratio. We should make that clear in naming #defines, field names, etc...

HD-DENBUG-318_Rejection Ratio Setting Feature Implementation IN Manufacturing Configuration For Treatment Staging
HD-DENBUG-318_Rejection Ratio Setting Feature Implementation IN Manufacturing Configuration For Treatment Staging
Bamboo Commit: Updated the Copyright section and replaced tabs with 4 spaces