Clone Tools
  • last updated a few seconds ago
Constraints
Constraints: committers
 
Constraints: files
Constraints: dates
Changes for RO pump override reset.

Updated code for multiple override.

WIP for setting multiple overrides

removed check for zero flow rate

Added backup variable for pump data and fixed set function behavior

LDT-566: code review comments

  1. … 13 more files in changeset.
LDT-566: Code review comments. added reset calls in ro pump controllers when leaving off states. removed pressure check for boost pump.

  1. … 7 more files in changeset.
LDT-566: fixed macro calls

LDT-566: changed permeate flush to target flow. fixed output scaling for fluid pump. Target flow fixes

  1. … 5 more files in changeset.
LDT-566: code review comments.

  1. … 19 more files in changeset.
LDT-566: FP Safety shutdown override. fixed includes.

  1. … 12 more files in changeset.
WIP on develop

LDT-566: code review comments. updated common naming to have a FP prefix.

  1. … 39 more files in changeset.
LDT-566: removed unneeded defines. Added percentage values for pwm to RO and boost broadcasts. Removed X5 from pressure sensors. Fixed Pre-Generate mode rushing through sub states.

  1. … 12 more files in changeset.
LDT-566: Implemented hard stop commands for water pumps. Added valve actuation for RO recovery settings in gen permeate, set to med.

  1. … 7 more files in changeset.
LDT-566: transitioning to standby mode and fault mode will now shut off pumps and close valves. updates in naming. fixed pre-gen transitioning. removed some checks for when gen water request it received.

  1. … 13 more files in changeset.
LDT-566: generate water modes both defeatured and ro featured

  1. … 28 more files in changeset.
LDT-566: updated naming across the project. Renamed files some fits to fit naming. Filter flush and permeate flush implemented.

  1. … 70 more files in changeset.
LDT-566: code review comments. S32 override implementations. Changed flow rates from FPGA to S32

  1. … 7 more files in changeset.
LDT-566: implemented RO and boost control states between target pressure and target flow

  1. … 1 more file in changeset.
LDT-566: code review comments. addressed formatting

  1. … 1 more file in changeset.
LDT-566: code review comments.

LDT-566: code review comments

  1. … 1 more file in changeset.
LDT-566: code review comments

  1. … 1 more file in changeset.
LDT-566: reflect changes from boost pump to ro pump

LDT-566: Fluid Pump controllers. Renamed RO common to FP common to be in line of subsystem naming.

  1. … 12 more files in changeset.
LEAH-1972: Addressed code review comments.

  1. … 1 more file in changeset.
LEAH-1972: Refactored component names.

  1. … 25 more files in changeset.
TEST: refactor component names.

  1. … 25 more files in changeset.
LEAH-250: Addressed code review comments.

  1. … 8 more files in changeset.
LEAH-250: Added RO pumps driver and controller units.

  1. … 11 more files in changeset.