Modes

Clone Tools
  • last updated a few seconds ago
Constraints
Constraints: committers
 
Constraints: files
Constraints: dates
DEN-15715 added a command to close VRD1 prior to transitioning to chemical disinfect cancel water path

Bamboo Commit: Updated the Copyright section and replaced tabs with 4 spaces

Merge branch 'DEN-15691-heat-disinfect-reservoir-leak-alarm-triggers-after-5s-when-srsdg-512-and-521-say-it' into develop

Timeout increased from 5 to 10 seconds

DEN-15691-heat-disinfect-reservoir-leak-alarm-triggers-after-5s-when-srsdg-512-and-521-say-it

Corrected comment alignment

DEN-15691-heat-disinfect-reservoir-leak-alarm-triggers-after-5s-when-srsdg-512-and-521-say-it

Undated 5second timeout to 10 seconds

DEN-15697 changed the code to correctly set the drain timeout in active cool mode

DEN-15619 removed the variable to not trigger a temperature not reached to target alarm in chemical disinfect

DEN-15660, DEN-15523, DEN-15528 changed the acid deprime state in chemical disinfect. Updated the chemical disinfect prime state

DEN-15660, DEN-15727 removed the chemical disinfect flush complete date set from its complete state since it should only be updated if the sample passed

DEN-15660, DEN-15528, DEN-15523 updated the chemical disinfect's moving average. Added a new state to deprime the acid line in chemical disinfect and then park the acid pumpf for the rest of the chemical disinfect

  1. … 2 more files in changeset.
Bamboo Commit: Updated the Copyright section and replaced tabs with 4 spaces

  1. … 1 more file in changeset.
DEN-15701: handle stop DG command from HD while in standby water sampling states.

  1. … 1 more file in changeset.
Bamboo Commit: Updated the Copyright section and replaced tabs with 4 spaces

DEN-15647 addressed the code review comments

DEN-15610 fixed DG flush to write basic flush complete timestamp in the usage record

Merged DEN-15647

  1. … 1 more file in changeset.
DEN-15647 updated the heat disinfect active cool mode to deenergize the actuators prior to transitioning to cancel water path state

Bamboo Commit: Updated the Copyright section and replaced tabs with 4 spaces

  1. … 1 more file in changeset.
DEN-15571, DEN-15398 changed the fill mode full speed prime time from 8 seconds to 7 seconds

DEN-15571 addressed the code review comments

DEN-15571 updated the chemical disinfect drain status function

DEN-15571 made changes in the chemical disinfect mode to not trigger the max temeprature and conductivity out of range until the end of the chemical disinfect mode

Merged staging

  1. … 7 more files in changeset.
Bamboo Commit: Updated the Copyright section and replaced tabs with 4 spaces

  1. … 13 more files in changeset.
DEN-15571 changed the chemical disinfect temperature timeout from 1 minute to 5 minutes

Merge branch 'DEN-15367-hd_dg_test_configuration_setup' into develop

  1. … 4 more files in changeset.
DEN-15367 removed the payload from the message that informs HD that DG is ready to dispense more fluid in DG. DEN-15571 fixed the chemical disinfect state machine to transition to cancel water path once the target temperature was not reached within the specified time

  1. … 1 more file in changeset.
DEN-15367 addressed the code review comments

  1. … 5 more files in changeset.
DEN-15522 fixed the heat disinfect active cool fill timeout not triggering. DEN-14805 fixed chemical disinfect reservoir leak alarm

Merge branch 'DEN-15367-hd_dg_test_configuration_setup' into develop

  1. … 4 more files in changeset.