Can we add current DD recirculation Dwell Time, WCID recirculation Dwell time variables as well and get the required dialin/automated system testing changes?
Can we add current DD recirculation Dwell Time, WCID recirculation Dwell time variables as well and get the required dialin/automated system testing changes?
The current implementation and OR and AND logic is a problem , We need a better logic here. for the time being OR is better so that it won't suck up till pressure drops to 4PSI
The current implementation and OR and AND logic is a problem , We need a better logic here. for the time being OR is better so that it won't suck up till pressure drops to 4PSI