Fixed reset during fill and full. Adjusted samples for duty cycle average calculation.

  1. … 1 more file in changeset.
LDT-2116 RO RR and duty cycle to start with has been updated

  1. … 1 more file in changeset.
LDT-2116 Added code for RO rejection ratio broadcast and dialin overrides.

  1. … 3 more files in changeset.
LDT-2116 changed Gen logic to go open loop for 3 sec and transition to closed loop.

  1. … 1 more file in changeset.
LDT-2116: removed manual level control out of pre gen mode. Permeate tank control will be sub mode specific. implemented in permeate flush to prevent overfill

LDT-2116: code review updates. Change target flow rate from 700 to 750 per system spec. Reverted debugging broadcast for RO Pump.

  1. … 2 more files in changeset.
LDT-2116: fixed handle function call where it shouldnt have been called.

LDT-2116: Updates to pre gen tank control such that it does not recirculate water while in the op mode.

LDT-2116: Added concentrate flush changes to keep the permeate tank full in pre-gen

LDT-1809 Resolved conflicts while merging staging

  1. … 1 more file in changeset.
LDT-1735: fixed merge conflicts.

    • -0
    • +368
    ./InletPressureCheck.c
  1. … 1 more file in changeset.
LDT-1242: code review comments. comment aligning. fix ro pump control calling set pwm pct when it should have been pwm cnt

  1. … 2 more files in changeset.
Merge branch 'staging' into LDT-1242-iofp-finalize-permeate-tank

LDT-1242: added TODO for condition check when P7 is no longer available.

LDT-1809 latest from staging

LDT-1242: updates to pre gen mode timeouts

Updated ToDo check for inletpressurecheck init call

LDT-1242: updated flow control curve. Renamed fp def op modes. Closing P39 on TANK FULL state

  1. … 3 more files in changeset.
Addressed review comment to remove flag assignment in paused state.

Fixed the issue to set targets to zero when a firmware call is made for set functions per review comments.

  1. … 2 more files in changeset.
Addressed review comments.

  1. … 1 more file in changeset.
Addressed review comments to remove unwanted code lines and handled state assignment.

LDT-566: increased permeate flush timer to 5 minutes to support conductivity testing.

LDT-566: moved valve enum from ro firmware repo to common repo

  1. … 2 more files in changeset.
LDT-566: moved valve enum from ro firmware repo to common repo

  1. … 2 more files in changeset.
Implemented Inlet Pressure check functionality with Boost Pump

    • -0
    • +371
    ./InletPressureCheck.c
    • -0
    • +53
    ./InletPressureCheck.h
  1. … 3 more files in changeset.
LDT-566: code review comments

  1. … 10 more files in changeset.
LDT-566: code review comments.

  1. … 2 more files in changeset.
LDT-566: Code review comments. added reset calls in ro pump controllers when leaving off states. removed pressure check for boost pump.

  1. … 5 more files in changeset.
LDT-566: changed permeate flush to target flow. fixed output scaling for fluid pump. Target flow fixes